LIRR 3rd Track Expansion Project

This LIRR expansion project will reduce train congestion and delays and enable dependable bi-directional service during peak hours with a more reliable rail network. This work includes several related projects, including the construction of parking garages, retaining walls, improvements to rail bridges, and the removal of eight street-level grade crossings along 9.8 miles stretches from Floral Park to Hicksville, NY.

JOADEM was hired on this project by M & J Engineering, a subcontractor to 3TC, to provide Special Inspections and Materials Testing Laboratory services from September 2019 to date.

 

Client:    Long Island Rail Road
General Contractor:   3TC
Project Engineer: 
Contact Person: M & J Engineering
LIRR 3rd Expansion 2
LIRR 3rd Expansion 1

Harold Track Expansion Project

Harold Track Project (Contract CH057D) is an integral part of the East Side Access (ESA) project. It contains more than 1.85 miles of new track, 13 turnouts and related infrastructure. This project was completed by Railroad Construction Company (RCC) on time and on budget.

JOADEM Corporation was hired by RCC to conduct Inspections and Materials field testing and Laboratory services ranging.

Work schedules were both during day and night, 24 hours round the clock in order to complete the project within set time.

Client:    Harold Track Part 3
General Contractor:   Railroad Construction Company
Project Engineer: 
Contact Person: 973-413-1902
Image of Harold Track work