This project consists of installing approximately 300’ of 5” PVC conduit in a trench with full restoration between manholes across Sunrise Highway on North Park Avenue. JOADEM Corporation was contracted by the Village of Rockville Center and approved by the NYSDOT to implement the Quality Control/Quality Assurance program throughout the entire project duration.
The scope of work entailed the installation of six 5″ PVC schedule 40 conduits on North Park Avenue from the southside of Sunrise Highway specifically manhole 1666 to the north side of Sunrise Highway manhole 1677. Additionally, four 5″ PVC schedule 40 conduits will go from manhole 1666 to manhole 588 and from 588 to 1677. Additionally, the repair of manhole 588 was required once the conduits have been installed.
JOADEM Corporation was hired to monitor the work of the Village of Rockville Center and Contractor to ensure that the work performed under the contract was done in accordance with the plans, the Standard Specifications, and all other requirements of the permit. This included; documenting and informing the NYSDOT of deficiencies in workmanship, material quality, Work Zone Traffic Control, Safety, etc.
Services performed under this contract include but not limited to:
OWNER/CLIENT
NYSDOT
YEAR COMPLETED
2025
Copyright 2023 © Joadem Corporation. Designed by www.iqdigits.com